Move workloads to AWS, Google Cloud, Azure, or Vercel with a documented rollback plan and post-cutover cost review.

Assess
Inventory apps, data, and constraints. Produce a written cutover plan.
Migrate
Replatform, replicate data, and rehearse rollback before go-live.
Optimize
Tune cost, autoscaling, and alerts after traffic is on the new stack.
Agentic Academy Labs migrates startups and growing teams to AWS, Google Cloud, Azure, or Vercel. Typical projects take four to sixteen weeks and include a rollback plan, an agreed downtime window, and a post-migration cost look, not only a cutover date.
We follow assess, plan, migrate, optimize. Most failures we see come from skipping inventory, lacking a rollback owner, or ignoring run-rate cost after DNS flips.
Application replatforming and Docker where it reduces drift. Database migration with replication and checksums. Terraform or equivalent infrastructure-as-code. CI/CD via GitHub Actions. Auto-scaling, load balancing, CDN, and alerts before the cutover, not after the first outage.
Prep with our cloud migration checklist for startups. If the product is moving to Next.js at the same time, read migrate a monolith to Next.js and PostgreSQL.
Combine migration with AI web app development when product and infrastructure move together. Schedule a call to scope your cutover. We agree the downtime window in writing before anyone touches production DNS.
AWS, Google Cloud, Azure, and Vercel, chosen for your workload, cost targets, and team skills. We document rollback plans before cutover.